SUPPLY OF 3 PHASE 4 WIRE EHT CT-PT OPERATED TOD METER BI- DIRECTIONAL (NET METER)
ANNUAL REQUIREMENT OF CONSUMABLES
PROCUREMENT OF BATTERY OPERATED THREE WHEELER PASSENGER VEHICLE - TYPE 2 THROUGH GEM
DESIGN SUPPLY INSTALLATION AND MAINTENANCE OF FULLY AUTOMATED ELECTRO- MECHANICAL MULTI-LEVEL CAR PARKING SYSTEM AT EDAPPALLY METRO STATION ON EPC MODE
THIRD PARTY INSPECTION FOR FABRICATION ERECTION AND COMPLETE WORKS FORRNSTRUCTURAL STEEL SUPER STRUCTURE WORKS PRE ENGINEERED BUILDING-PEB FOR CONTRACTRNPACKAGE EPC CONTRACT FOR DESIGN SUPPLY FABRICATION ERECTION COMMISSIONINGRNOF BG5 MULTI STOREY INSTITUTIONAL BUILDING PRE-ENGINEERED BUILDING STRUCTURERNINCLUDING ALL ARCHITECTURAL CIVIL AND MEP WORKS FOR IIM KOZHIKODE