Retrofitting Track Fastenings to Mitigate Stray


               Current






               As part of ongoing infrastructure improvements, the track section between MUTT and

               KLMT on the UP line has undergone retrofitting by replacing the existing Vossloh 336
               fastenings with the new and improved 336iw fastenings. This upgrade was executed

               using  available  balance  spares  from  Phase  1  projects,  ensuring  cost-effective
               utilization of resources. The retrofitting work, covering a total stretch of 2 kilometers,

               has  now  been  successfully  completed.  The  primary  objective  of  this  initiative  is  to

               mitigate  stray  current  interference,  which  can  cause  corrosion  in  adjacent  metallic
               structures and disrupt signaling systems. Additionally, the 336iw fastenings enhance

               the floating properties of the track, improving electrical isolation and reducing leakage

               currents.