Page 14 - Sattva_2024
P. 14

CMRS Inspection- Successful Phase 1B Testing




             A recent milestone was the successful completion of testing in Phase 1B of the Kochi

             Metro, followed by a CMRS inspection on March 12th and 13th. Train operations played

             a pivotal role during this inspection, with two trains and four operators actively involved.




             A series of crucial tests were conducted, including speed profile verification, rollback

             testing, evaluation of the interface between rolling stock and the signalling system, and

             power  traction  checks.  Service  trials  were  then  conducted  following  the  successful

             completion of the inspection.